Jump to content
Create New...
  • David
    David

    $5 Billion Over Five Years for National EV Charging Network Plus More

      Today the President of the United States, Department of Energy and Department of Transportation announced the National Electric Vehicle Infrastructure (NEVI) Program, established by the Bipartisan Infrastructure Law to build out the national electric vehicle charging network as a step towards making EV charging accessible to all Americans everywhere.

    The nearly $5 billion dollar NEVI program is to help states create a network of EV charging stations along the Interstate Highway System. The total amount available under Fiscal Year 2022 is $615 million and states must submit an EV Infrastructure Deployment Plan before access is given to the funds.

    A second, competitive grant program will be announced later this year with the details on how additional funding can be accessed with a focus on increasing EV charging access throughout the country that is focused on rural and underserved communities. 

    This will help drive charging numbers across the country.

    Quote the press release:

    “A century ago, America ushered in the modern automotive era; now America must lead the electric vehicle revolution,” said U.S. Transportation Secretary Pete Buttigieg. “The President’s Bipartisan Infrastructure Law will help us win the EV race by working with states, labor, and the private sector to deploy a historic nationwide charging network that will make EV charging accessible for more Americans.”

    “We are modernizing America’s national highway system for drivers in cities large and small, towns and rural communities, to take advantage of the benefits of driving electric,” said U.S. Secretary of Energy Jennifer M. Granholm. “The Bipartisan Infrastructure Law is helping states to make electric vehicle charging more accessible by building the necessary infrastructure for drivers across America to save money and go the distance, from coast-to-coast.”

    A part of this Bipartisan program is that the hardware is all to be made in America with details to be found here: EV Charger Manufacturing in America

    A key part of this is the commitment to purchase 30,000 DC Fast chargers per year made in America by Tritium at the Lebanon, Tennessee manufacturing facility that will employ 500 local jobs alone. This is on top of major announcements for key investments in U.S. manufacturing by Intel, General Motors, Boeing, Ford, Siemens, ABB, Freewire Technologies and Dunamis Clean Energy Partners. These companies are focusing on ensuring the U.S. has ample supply of semiconductors, electric vehicles, aircraft, batteries, both current Lithium-ion and all-solid-state, EV charging from home Level 2 chargers to DC Fast chargers and commercial DC Fast Chargers for commercial autos. This program is also working to ensure minorities and especially woman-owned businesses are included in all levels of business in relation to the future of the electric auto industry and supporting supply chain needs in North America.

    This is just a start as the Bipartisan Program also includes $7 Billion in funding to secure American EV supply chain, from materials processing to battery manufacturing and recycling. The bill also will take the EV Charging Network to a total of $7.5 Billion dollars as they bring online the national public charging network that covers rural and underserved communities.

    NEVI will build on the Alternative Fuel Corridors that nearly every state has designated over the past six years. These alternative Fuel Corridors will be the spine of the National EV Charging Network. An example of this is the West Coast Electric Highway that started by ensuring charging was available at rest stops and local restaurants from Vancouver BC, Canada south through Washington, Oregon and California ending in Baja California. This allowed people with BEVs to make road trips all along the west coast and have access to recharging. It has since expanded over the last decade to include many state roads. The coastal road of highway 101 as well as the inner-city highway 99 are both included in the west coast electric highway system.

    West Coast Green Highway: West Coast Electric Highway

    For those that are interested in everything from tools, assistance to jobs in the growing field of zero-emission transportation infastructure, a new web site has been build and is open for folks to review as it is a joint effort by the Joint Office of Energy and Transportation.

    Home Page · Joint Office of Energy and Transportation (driveelectric.gov)

    For those that like a quick list of facts and the details supporting this here is the 411 or detailed go to for information.

    I will say that it is a very interesting observation that those states that have been very resistance to BEVs and the whole green new deal for power in the south are some of the very states getting some of the largest funding for NEVI. A quick example of this is Texas with $407,774,759 in NEVI funding and Florida with $198,057,481 in NEVI funding.

    Current Fiscal Year 2022 Funding by State

    This program is aimed at having the U.S. lead the world in a move to BEVs and put the U.S. on a course to reach net-zero emissions by 2050.

     

    President Biden, USDOT and USDOE Announce $5 Billion over Five Years for National EV Charging Network, Made Possible by Bipartisan Infrastructure Law | US Department of Transportation

    President Biden, DOE and DOT Announce $5 Billion over Five Years for National EV Charging Network | Department of Energy

    President Biden, USDOT and USDOE Announce $5 Billion over Five Years for National EV Charging Network, Made Possible by Bipartisan Infrastructure Law | FHWA

    Alternative Fuel Corridors - Environment - FHWA (dot.gov)


    User Feedback

    Recommended Comments

    There are no comments to display.



    Join the conversation

    You can post now and register later. If you have an account, sign in now to post with your account.
    Note: Your post will require moderator approval before it will be visible.

    Guest
    Add a comment...

    ×   Pasted as rich text.   Paste as plain text instead

      Only 75 emoji are allowed.

    ×   Your link has been automatically embedded.   Display as a link instead

    ×   Your previous content has been restored.   Clear editor

    ×   You cannot paste images directly. Upload or insert images from URL.


  • google-news-icon.png



  • google-news-icon.png

  • Subscribe to Cheers & Gears

    Cheers and Gears Logo

    Since 2001 we've brought you real content and honest opinions, not AI-generated stuff with no feeling or opinions influenced by the manufacturers.

    Please consider subscribing. Subscriptions can be as little as $1.75 a month, and a paid subscription drops most ads.*
     

    You can view subscription options here.

    *a very limited number of ads contain special coupon deals for our members and will show

  • Community Hive Community Hive

    Community Hive allows you to follow your favorite communities all in one place.

    Follow on Community Hive
  • Posts

    • I am not aware of travel cases for internal drives. Usually you have the drive and once you have made sure you own static electricity is discharged on your body, open the computer and unplug the power cable and data cable to the HD. Then you unscrew the screws holding the drive in. Put the drive into an Anti-Static bag and then usually into a box that has foam padding on all sides to protect the drive and then tape it up to close it.  With both drives in their proper storage bags, you can then have both drives in between foam insulation for handling any dropping of the box, etc. Pack them in a box and tape shut, should then easily handle going through your carry on or checked in luggage. To ship a hard drive, you need to: Secure the hard drive in its original packaging or anti-static bag. If you don't have an anti-static bag, place the drive into a zipped freezer bag to prevent any moisture getting into the drive during transit. Sandwich the drive between foam or wrap it in bubble wrap to absorb any minor shocks. Put the hard drive in a padded shipping box. Close and seal the box. Label your package. Amazon.com : hard drive shipping box This is pretty much all you need.
    • Either a co-pilot first time landing or something truly went wrong on the plane.
    • The incoming rectangular lamps on many GM cars in that era made them much more attractive.  They made a big difference. Now, as far the powerplant went, the notion of 500 cubic inches was mindboggling even during the malaise era.  If you want to see someone's jaw drop, tell a European that their engines have 8200 cc or 8.2 liters.  For those who aren't driving the occasional Mustang or Camaro you see, they freak out at anything over 2,500 or 3,000 cc.
    • Thank you for the response. I want to reinstall them into the computers, especially the "newer" one.  The old one has been a real champ.   The reason for not leaving them in the desktop is that the basic tower might have to be transported ... and not by me.  That means it will be out of my possession for a while.  Since the HDs would be traveling with me, they'll have to get scanned through airport security a time or two.  I'm guessing that shouldn't mess with the data.   I've already backed up the C drive on several large 1 TB portable hard drives.  I don't want to touch the basic functions and files on the computers since I don't know how that all works.  I stay away from the drives and files I am not familiar with. I tend to donate other things to charity.   I did give the Regal I once owned to charity.   A good friend told me that, about a month or two later, he saw it being driven around the city by its new owner and we had a good laugh. This is what I want to do.  I'm just trying to figure out if the guy or gal at Office Depot can size a case based on looking up the unit and the HD in it.  Any ideas on that part?  Or should I do that and approximate the size and weight of the part to get the cases?
    • I'm wondering about a lot of things related to this.  I am sure that, sadly, the passengers inside were jolted.  This is way different from a rough landing. Why was it even necessary to do it?  What was going on at the airport property at that time?  How does one even pull this off?  I've seen some vids of where they barely touch and then go off again, but this one looks way more complicated.
  • Who's Online (See full list)

    • There are no registered users currently online
  • My Clubs

×
×
  • Create New...

Hey there, we noticed you're using an ad-blocker. We're a small site that is supported by ads or subscriptions. We rely on these to pay for server costs and vehicle reviews.  Please consider whitelisting us in your ad-blocker, or if you really like what you see, you can pick up one of our subscriptions for just $1.75 a month or $15 a year. It may not seem like a lot, but it goes a long way to help support real, honest content, that isn't generated by an AI bot.

See you out there.

Drew
Editor-in-Chief

Write what you are looking for and press enter or click the search icon to begin your search

Change privacy settings