dfelt

2017 Chevy BOLT's Production Ramping UP

1 post in this topic

G. David Felt
Staff Writer Alternative Energy - www.CheersandGears.com

 

2017 Chevy BOLT's Production Ramping UP

BoltAssemblyLine.jpg

Reuters is reporting that GM has decided to ramp up BOLT production at the Orion assembly plant. Currently every fifth car on the assembly line is a Bolt. The Orion plant is capable of building 90,000 auto's a year with a single workers shift. GM has stated a goal of 30,000 BOLTs which does take into account the European model that is also being built here and shipped over seas. Currently the other auto's being built are the gas powered Chevrolet Sonic sedan and hatchback. With sales falling off on the Sonic, this gives room to continue to increase all year long the production of the BOLTs if the public demands them.

Reuters does state that GM has confirmed that there car sharing operation, Lyft will be getting many of the BOLTs first at the same time they declined to stated how many pre-orders have been received. Yet GM has increased production implying that demand is much greater than estimated.

BoltAssemblyLine1.jpg

GM's flexible production line continues to show how easy it has become to build an auto with a gas powered drive train and then on the next auto bolt in the battery pack. They say they could if needed offer some overtime and build on Saturday before they end up moving to a second shift.

Growth in America's rust belt. 

Share this post


Link to post
Share on other sites

Your content will need to be approved by a moderator

Guest
You are commenting as a guest. If you have an account, please sign in.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoticons maximum are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




  • Similar Content

    • By William Maley
      October has not been the best of months for Nissan. Earlier this month, Japan’s transport ministry revealed that at five of the company's six plants in the country had quality checks being certified by unauthorized workers. According to Reuters, vehicles destined for the domestic market have to go under a final check by certified technicians.
      “It’s extremely regrettable, causing anxiety for users and shaking the foundation of the certification system,” said Minister of Land, Infrastructure, Transport and Tourism Keiichi Ishii at a press conference earlier this month.
      Nissan announced that it would be recalling 1.2 million vehicles built within the past three years due to this issue.
      The news has only gotten worse as the Japanese automaker announced today that it would be suspending production at all of their Japan plants for at least two weeks to investigate and address this issue. Nissan CEO Hiroto Saikawa revealed at a briefing that this unauthorized approval continued a month after Nissan was told about this issue and said it strengthened the control of its inspection processes.
      “Our emergency measures were not enough. We were unable to change our bad habits,” said Saikawa
      There are numerous factors as to how this debacle developed including increasing the efficiency of the inspection process and plants transferring the checks to other lines.
      Nissan is planning on recalling an additional 34,000 vehicles for re-inspection.
      Production of export vehicles will continue as this issue is specific to Japanese-market models.
      Source: Reuters, 2, Bloomberg, Nissan
      Press Release is on Page 2


      Regarding recurrence of final vehicle inspection issue at Nissan’s vehicle plants in Japan
      YOKOHAMA, Japan – As previously announced, on September 18 the Japanese Ministry of Land, Infrastructure and Transportation (MLIT) notified Nissan that in the final vehicle inspection process, certain checks were carried out by technicians not properly registered to perform those duties under Nissan’s own processes. Nissan took corrective measures at Japanese production plants by September 20 to address the issue. By October 18, the investigation team (led by a third party) discovered that at its Oppama, Tochigi and the Nissan Kyushu plants, certain parts of the final inspection process were still being carried out by technicians not properly registered to perform those duties for vehicles for the Japan market.
      Nissan decided today to suspend vehicle production for the Japan market at all Nissan and Nissan Shatai plants in Japan.
      Nissan regrets any inconvenience and concern this has caused to its valued customers and other stakeholders in Japan.
      Findings
      The plants transferred final vehicle inspection check items from the final vehicle inspection line to other lines, such as the “marketability inspection” and the “offline inspection”. As a result, employees who were not internally registered as final vehicle inspectors performed final vehicle inspections. Measures planned
      Nissan will take the following actions with regard to the production line and vehicles that did not meet Japanese market requirements for final inspection:
      Production line in the plants
      The final vehicle inspection line will be configured as originally submitted to MLIT, consolidating all final inspection processes. Final inspection process will be separated from other processes and only internally registered final vehicle inspectors will have access to the final inspection line. Unregistered and registered vehicles
      Nissan is considering re-inspecting the unregistered vehicles at certified Nissan dealership facilities throughout Japan. Nissan is considering submitting a noncompliance recall report for registered vehicles. Approximately 34,000 vehicles produced between September 20 – October 18, 2017 including those produced for other makers will be subject to re-inspection. Nissan regards the recurrence of this issue at domestic plants — despite the corrective measures taken — as critical. The investigation team will continue to thoroughly investigate the issue and determine measures to prevent recurrence. Details of the above will be included in the final report to be published on a later date.
    • By William Maley
      October has not been the best of months for Nissan. Earlier this month, Japan’s transport ministry revealed that at five of the company's six plants in the country had quality checks being certified by unauthorized workers. According to Reuters, vehicles destined for the domestic market have to go under a final check by certified technicians.
      “It’s extremely regrettable, causing anxiety for users and shaking the foundation of the certification system,” said Minister of Land, Infrastructure, Transport and Tourism Keiichi Ishii at a press conference earlier this month.
      Nissan announced that it would be recalling 1.2 million vehicles built within the past three years due to this issue.
      The news has only gotten worse as the Japanese automaker announced today that it would be suspending production at all of their Japan plants for at least two weeks to investigate and address this issue. Nissan CEO Hiroto Saikawa revealed at a briefing that this unauthorized approval continued a month after Nissan was told about this issue and said it strengthened the control of its inspection processes.
      “Our emergency measures were not enough. We were unable to change our bad habits,” said Saikawa
      There are numerous factors as to how this debacle developed including increasing the efficiency of the inspection process and plants transferring the checks to other lines.
      Nissan is planning on recalling an additional 34,000 vehicles for re-inspection.
      Production of export vehicles will continue as this issue is specific to Japanese-market models.
      Source: Reuters, 2, Bloomberg, Nissan
      Press Release is on Page 2


      Regarding recurrence of final vehicle inspection issue at Nissan’s vehicle plants in Japan
      YOKOHAMA, Japan – As previously announced, on September 18 the Japanese Ministry of Land, Infrastructure and Transportation (MLIT) notified Nissan that in the final vehicle inspection process, certain checks were carried out by technicians not properly registered to perform those duties under Nissan’s own processes. Nissan took corrective measures at Japanese production plants by September 20 to address the issue. By October 18, the investigation team (led by a third party) discovered that at its Oppama, Tochigi and the Nissan Kyushu plants, certain parts of the final inspection process were still being carried out by technicians not properly registered to perform those duties for vehicles for the Japan market.
      Nissan decided today to suspend vehicle production for the Japan market at all Nissan and Nissan Shatai plants in Japan.
      Nissan regrets any inconvenience and concern this has caused to its valued customers and other stakeholders in Japan.
      Findings
      The plants transferred final vehicle inspection check items from the final vehicle inspection line to other lines, such as the “marketability inspection” and the “offline inspection”. As a result, employees who were not internally registered as final vehicle inspectors performed final vehicle inspections. Measures planned
      Nissan will take the following actions with regard to the production line and vehicles that did not meet Japanese market requirements for final inspection:
      Production line in the plants
      The final vehicle inspection line will be configured as originally submitted to MLIT, consolidating all final inspection processes. Final inspection process will be separated from other processes and only internally registered final vehicle inspectors will have access to the final inspection line. Unregistered and registered vehicles
      Nissan is considering re-inspecting the unregistered vehicles at certified Nissan dealership facilities throughout Japan. Nissan is considering submitting a noncompliance recall report for registered vehicles. Approximately 34,000 vehicles produced between September 20 – October 18, 2017 including those produced for other makers will be subject to re-inspection. Nissan regards the recurrence of this issue at domestic plants — despite the corrective measures taken — as critical. The investigation team will continue to thoroughly investigate the issue and determine measures to prevent recurrence. Details of the above will be included in the final report to be published on a later date.

      View full article
    • By dfelt
      G. David Felt - Staff Writer Alternative Energy - www.cheersandgears.com
      Pamela Fletcher VP of BOLT Program to Head GM Global EV Program
      Today GM announced that Pamela Fletcher VP of the Chevrolet BOLT Program will lead the new GM Global Electric Vehicle Programs. Pamela oversaw the Cadillac ELR program, then the Chevrolet Spark EV and the Volt 2.0 before leading the BOLT program. In her new role she will report to Doug Parks who leads the GM Autonomous and Electric Vehicle Programs and lead the launch of GM's more than 20 EV auto's over the next 5 years.
      Pamela also led the development team that created Super Cruise, the industry's first hands free highway driver assist system.
      Under Pamela's leadership, GM will grow their Zero Emissions program around the Globe.
      GM News Release
    • By William Maley
      The strike at General Motors' CAMI Assembly plant, home of the Chevrolet Equinox has come to an end. Today, 86 percent of Unifor Local 88 members voted yes on a new 4-year contract. With the approval, workers will resume work at the plant beginning at 7 PM tonight for early start-up, with production beginning at 11 PM.
      Here is what new 4-year contract include
      Stronger language around job security. Union said the new contract would make it more costly for GM to close down CAMI - $290 million vs. $190 million. If CAMI is shuttered, employees near retirement will still be able to get into a retirement program. Workers will get a 4 percent wage hike and $8,000 in lump-sum payments over the contract New hires on the production line will see an accelerated pace in terms of their wages increased to the max of $34.15 per hour A $6,000 performance bonus once the deal is ratified "The ratification of a new 4-year agreement between GM Canada and Unifor Local 88 at CAMI Assembly is welcome news for our company, employees and the community. We have an outstanding new product at CAMI with the Chevrolet Equinox and I am confident that we will quickly pull together to continue to demonstrate to the world the outstanding productivity, innovation and quality that is synonymous with the CAMI workforce," said Steve Carlisle, President of GM Canada in a statement.
      There is one thing missing from this contract, a written assurance that CAMI would be the lead producer of the Equinox. This was the major point of contention between the two during negoations.
      It is clear that Unifor officials are not happy with this contract.
      “The end result was not the result we were hoping for, it shows the true colors of GM,” Unifor Local 88 Chair Mike Van Boekel said in a statement to members.
      Given these actions, our demand to protect the Equinox was not only fair and reasonable, it simply made sense. Our members had every reason to make this [lead producer] demand, and did everything to demonstrate it was a demand that deserved to be met. However, at the highest levels of General Motors corporate in Detroit, they coldly refused. As a result and after much internal discussion, we decided that we could not, in good conscience, ask for more economic sacrifice from you in this fight,” said Unifor National President Jerry Dias.
      We have to wonder if GM's threat of ramping up Equinox production in Mexico issued last week was the turning point.
      Source: Automotive News (Subscription Required), CBC News, GM
      Press Release is on Page 2
      2017 CAMI / UNIFOR NEGOTIATIONS
      The ratification of a new 4-year agreement between GM Canada and Unifor Local 88 at CAMI Assembly is welcome news for our company, employees and the community. We have an outstanding new product at CAMI with the Chevrolet Equinox and I am confident that we will quickly pull together to continue to demonstrate to the world the outstanding productivity, innovation and quality that is synonymous with the CAMI workforce.
      I want to extend thanks to the local and national Unifor teams who have worked long hours together with the GM negotiating team these past many weeks. The negotiations process requires a great deal of straight talk, creative problem solving, and compromise to achieve a positive outcome for both the membership and the Company.  Success is also achieved by remembering that we are here to serve our customers proudly and deliver the very best product and services to them. 
      Having grown up in Southwestern Ontario, the CAMI plant and the Oxford County community mean a great deal to me.  The challenges of the past months have been hard on all of us but now it’s time to show the character of our region and our plant. With the recent $800 million investment at the CAMI plant and this agreement, it is up to each of us to demonstrate the unparalleled value we deliver as leaders within Canada’s auto sector. The employees at CAMI have created a culture of team involvement and continuous improvement resulting in numerous industry awards for vehicle quality and productivity.  I am confident that by working as one team, that will continue for years to come.
      Steve Carlisle
      President and Managing Director
      General Motors Canada 

      View full article
    • By William Maley
      The strike at General Motors' CAMI Assembly plant, home of the Chevrolet Equinox has come to an end. Today, 86 percent of Unifor Local 88 members voted yes on a new 4-year contract. With the approval, workers will resume work at the plant beginning at 7 PM tonight for early start-up, with production beginning at 11 PM.
      Here is what new 4-year contract include
      Stronger language around job security. Union said the new contract would make it more costly for GM to close down CAMI - $290 million vs. $190 million. If CAMI is shuttered, employees near retirement will still be able to get into a retirement program. Workers will get a 4 percent wage hike and $8,000 in lump-sum payments over the contract New hires on the production line will see an accelerated pace in terms of their wages increased to the max of $34.15 per hour A $6,000 performance bonus once the deal is ratified "The ratification of a new 4-year agreement between GM Canada and Unifor Local 88 at CAMI Assembly is welcome news for our company, employees and the community. We have an outstanding new product at CAMI with the Chevrolet Equinox and I am confident that we will quickly pull together to continue to demonstrate to the world the outstanding productivity, innovation and quality that is synonymous with the CAMI workforce," said Steve Carlisle, President of GM Canada in a statement.
      There is one thing missing from this contract, a written assurance that CAMI would be the lead producer of the Equinox. This was the major point of contention between the two during negoations.
      It is clear that Unifor officials are not happy with this contract.
      “The end result was not the result we were hoping for, it shows the true colors of GM,” Unifor Local 88 Chair Mike Van Boekel said in a statement to members.
      Given these actions, our demand to protect the Equinox was not only fair and reasonable, it simply made sense. Our members had every reason to make this [lead producer] demand, and did everything to demonstrate it was a demand that deserved to be met. However, at the highest levels of General Motors corporate in Detroit, they coldly refused. As a result and after much internal discussion, we decided that we could not, in good conscience, ask for more economic sacrifice from you in this fight,” said Unifor National President Jerry Dias.
      We have to wonder if GM's threat of ramping up Equinox production in Mexico issued last week was the turning point.
      Source: Automotive News (Subscription Required), CBC News, GM
      Press Release is on Page 2
      2017 CAMI / UNIFOR NEGOTIATIONS
      The ratification of a new 4-year agreement between GM Canada and Unifor Local 88 at CAMI Assembly is welcome news for our company, employees and the community. We have an outstanding new product at CAMI with the Chevrolet Equinox and I am confident that we will quickly pull together to continue to demonstrate to the world the outstanding productivity, innovation and quality that is synonymous with the CAMI workforce.
      I want to extend thanks to the local and national Unifor teams who have worked long hours together with the GM negotiating team these past many weeks. The negotiations process requires a great deal of straight talk, creative problem solving, and compromise to achieve a positive outcome for both the membership and the Company.  Success is also achieved by remembering that we are here to serve our customers proudly and deliver the very best product and services to them. 
      Having grown up in Southwestern Ontario, the CAMI plant and the Oxford County community mean a great deal to me.  The challenges of the past months have been hard on all of us but now it’s time to show the character of our region and our plant. With the recent $800 million investment at the CAMI plant and this agreement, it is up to each of us to demonstrate the unparalleled value we deliver as leaders within Canada’s auto sector. The employees at CAMI have created a culture of team involvement and continuous improvement resulting in numerous industry awards for vehicle quality and productivity.  I am confident that by working as one team, that will continue for years to come.
      Steve Carlisle
      President and Managing Director
      General Motors Canada 
  • My Clubs

  • Who's Online (See full list)