Jump to content
Create New...
  • 🚗 Your People Are Here. Get In.

    The internet is full of car content. This is the community.

    Cheers & Gears has been bringing enthusiasts together since 2001. Join the conversation, show off your garage, and find your people.

  • G. David Felt
    G. David Felt

    $5 Billion Over Five Years for National EV Charging Network Plus More

      Today the President of the United States, Department of Energy and Department of Transportation announced the National Electric Vehicle Infrastructure (NEVI) Program, established by the Bipartisan Infrastructure Law to build out the national electric vehicle charging network as a step towards making EV charging accessible to all Americans everywhere.

    The nearly $5 billion dollar NEVI program is to help states create a network of EV charging stations along the Interstate Highway System. The total amount available under Fiscal Year 2022 is $615 million and states must submit an EV Infrastructure Deployment Plan before access is given to the funds.

    A second, competitive grant program will be announced later this year with the details on how additional funding can be accessed with a focus on increasing EV charging access throughout the country that is focused on rural and underserved communities. 

    This will help drive charging numbers across the country.

    Quote the press release:

    “A century ago, America ushered in the modern automotive era; now America must lead the electric vehicle revolution,” said U.S. Transportation Secretary Pete Buttigieg. “The President’s Bipartisan Infrastructure Law will help us win the EV race by working with states, labor, and the private sector to deploy a historic nationwide charging network that will make EV charging accessible for more Americans.”

    “We are modernizing America’s national highway system for drivers in cities large and small, towns and rural communities, to take advantage of the benefits of driving electric,” said U.S. Secretary of Energy Jennifer M. Granholm. “The Bipartisan Infrastructure Law is helping states to make electric vehicle charging more accessible by building the necessary infrastructure for drivers across America to save money and go the distance, from coast-to-coast.”

    A part of this Bipartisan program is that the hardware is all to be made in America with details to be found here: EV Charger Manufacturing in America

    A key part of this is the commitment to purchase 30,000 DC Fast chargers per year made in America by Tritium at the Lebanon, Tennessee manufacturing facility that will employ 500 local jobs alone. This is on top of major announcements for key investments in U.S. manufacturing by Intel, General Motors, Boeing, Ford, Siemens, ABB, Freewire Technologies and Dunamis Clean Energy Partners. These companies are focusing on ensuring the U.S. has ample supply of semiconductors, electric vehicles, aircraft, batteries, both current Lithium-ion and all-solid-state, EV charging from home Level 2 chargers to DC Fast chargers and commercial DC Fast Chargers for commercial autos. This program is also working to ensure minorities and especially woman-owned businesses are included in all levels of business in relation to the future of the electric auto industry and supporting supply chain needs in North America.

    This is just a start as the Bipartisan Program also includes $7 Billion in funding to secure American EV supply chain, from materials processing to battery manufacturing and recycling. The bill also will take the EV Charging Network to a total of $7.5 Billion dollars as they bring online the national public charging network that covers rural and underserved communities.

    NEVI will build on the Alternative Fuel Corridors that nearly every state has designated over the past six years. These alternative Fuel Corridors will be the spine of the National EV Charging Network. An example of this is the West Coast Electric Highway that started by ensuring charging was available at rest stops and local restaurants from Vancouver BC, Canada south through Washington, Oregon and California ending in Baja California. This allowed people with BEVs to make road trips all along the west coast and have access to recharging. It has since expanded over the last decade to include many state roads. The coastal road of highway 101 as well as the inner-city highway 99 are both included in the west coast electric highway system.

    West Coast Green Highway: West Coast Electric Highway

    For those that are interested in everything from tools, assistance to jobs in the growing field of zero-emission transportation infastructure, a new web site has been build and is open for folks to review as it is a joint effort by the Joint Office of Energy and Transportation.

    Home Page · Joint Office of Energy and Transportation (driveelectric.gov)

    For those that like a quick list of facts and the details supporting this here is the 411 or detailed go to for information.

    I will say that it is a very interesting observation that those states that have been very resistance to BEVs and the whole green new deal for power in the south are some of the very states getting some of the largest funding for NEVI. A quick example of this is Texas with $407,774,759 in NEVI funding and Florida with $198,057,481 in NEVI funding.

    Current Fiscal Year 2022 Funding by State

    This program is aimed at having the U.S. lead the world in a move to BEVs and put the U.S. on a course to reach net-zero emissions by 2050.

     

    President Biden, USDOT and USDOE Announce $5 Billion over Five Years for National EV Charging Network, Made Possible by Bipartisan Infrastructure Law | US Department of Transportation

    President Biden, DOE and DOT Announce $5 Billion over Five Years for National EV Charging Network | Department of Energy

    President Biden, USDOT and USDOE Announce $5 Billion over Five Years for National EV Charging Network, Made Possible by Bipartisan Infrastructure Law | FHWA

    Alternative Fuel Corridors - Environment - FHWA (dot.gov)


    User Feedback

    Recommended Comments

    There are no comments to display.



    Join the conversation

    You can post now and register later. If you have an account, sign in now to post with your account.
    Note: Your post will require moderator approval before it will be visible.

    Guest
    Add a comment...

    ×   Pasted as rich text.   Paste as plain text instead

      Only 75 emoji are allowed.

    ×   Your link has been automatically embedded.   Display as a link instead

    ×   Your previous content has been restored.   Clear editor

    ×   You cannot paste images directly. Upload or insert images from URL.




  • Support Independent Automotive Journalism

    25 years of honest automotive coverage — because someone has to do it.

    Cheers & Gears has never been filtered by manufacturer relationships or driven by algorithm. Just real people, real opinions, and a genuine love of cars. Subscribers keep the lights on and get an ad-light experience starting at $2.25/month.*

    View subscription options

    *A small number of ads feature member-exclusive coupon deals and will still appear.

  • Posts

    • Some of these famous buildings are hideous, some are interesting with decent parts to them, and a rare few are really nice. The hideous ones include the newer architecture building at University of Washington, Wurster Hall (also architecture) at UC Berkeley, and perhaps the Salk Institute in San Diego.  These buildings are cold and soul sucking, so they're hard to be in.  They also come from a fairly ugly sixties and seventies granola period, on various levels. One of these buildings would be a "hybrid" and it's fine.  That would be Campbell Hall (again architecture) at the University of Virginia, which is definitely brutalist reinforced concrete at the first level or two, with an exposed waffle slab at levels above you.  However, they soften it up by using brick on the upper floors' exterior, as well as lower floor to ceiling heights.  The one brutalist gem would have to be the main library at University of California San Diego.  They definitely did not do this to reduce costs because it's a complicated building.  However, it's probably a nice space to be inside because of the floor to ceiling windows all around. It's just that there was a wave of putting up these buildings on West Coast campuses, surrounded by eucalyptus or fir and hemlock, and it was usually at hippyish campuses and their atmospheres don't gel with me.
    • Happy Mother's Day to the mothers in our lives - family, friends, coworkers  She came to mind, so I looked for a gif on her.  She is originally from Buffalo!  Most people have doubles.  I don't think she does. Happy Sunday.
    • Having looked at all the images online, I have to say that the interior and exterior other than the color which I like is a let down and I would even say for a Luxury brand looks cheap.
    • Due to my tradeshow season, do not have the time till June to do any writeups, but Lexus has released their Luxury version 3 row SUV EV that Toyota released as the Highlander and Subaru also has. Clearly not connected to the ICE Spindale grill or as many of us called the Predator mouth. https://pressroom.lexus.com/all-electric-three-row-luxury-the-all-new-2027-lexus-tz/ The press release says 300 miles of range on Select Grade. Look at the fine print, this is a sea level level road, anything else is 250 to 280 miles of range. FAILURE Lexus / Toyota along with the 400V system.
    • After doing a bunch of research on this, it isn't so much Honda/Acura are limiting charging speeds as it is the battery pack total size directly correlates to the rate of charge they can accept. The Prologue and non-SS Blazer EV have 85kWh batteries at 288 total volts and the ZDX/Lyriq/Blazer EV SS all have the larger 102kWh battery at 345 total volts.  Because of the way the Ultium platforms have multiple pack sizes that can and are linked together to make larger or smaller packs, the total pack volts varies based on the application and why the Hummer/Silverado/Sierra EVs can charge at 800v when they're still on 400v architecture.  Because kW = amps * volts, the bigger packs have more nominal volts because they have more cells.  Below is a Prologue example and change the 288v for the Prologue to 345v for the larger packs of the Lyriq, ZDX, or Blazer EV SS and you get 190kW for the maximum (or do the math for the other chargers, as well)
  • Who's Online (See full list)

    • There are no registered users currently online
  • My Clubs

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Hey there, we noticed you're using an ad-blocker. We're a small site that is supported by ads or subscriptions. We rely on these to pay for server costs and vehicle reviews.  Please consider whitelisting us in your ad-blocker, or if you really like what you see, you can pick up one of our subscriptions for just $1.75 a month or $15 a year. It may not seem like a lot, but it goes a long way to help support real, honest content, that isn't generated by an AI bot.

See you out there.

Drew
Editor-in-Chief

Write what you are looking for and press enter or click the search icon to begin your search