Jump to content
Sign in to follow this  
Variance

H2 Plant Goes on a Two Week Shutdown

Recommended Posts

H2 Plant Goes on a Two Week Shutdown

Posted Image

An AM General plant that makes the Hummer H2 will shut down for two weeks this month as sales of the trucks have slowed.

Dealer lots have excess H2 inventory, so the production line in Mishawaka, just east of South Bend, will not run the weeks of Oct. 16 and Oct. 23, the company said. General Motors Corp. markets the H2 consumer truck.

Read "Plant that makes Hummer H2 to shut down for 2 weeks" @ Detriot Free press

Share this post


Link to post
Share on other sites

I was kind of wondering when we were going to hear about a cut back in production. The Hummer dealer here in Fargo has at least 5 on the lot, all 06s still. I can remember seeing the one H2 SUT there since June.

Share this post


Link to post
Share on other sites

I'm sure people could pick Hummer's up for a reasonable price if the dealers don't want to keep them on their lots. I myself wouldn't mind having one as a secondary transport as long as my daily 'muter was something like a Mazda 3 :P

Share this post


Link to post
Share on other sites

Your content will need to be approved by a moderator

Guest
You are commenting as a guest. If you have an account, please sign in.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoticons maximum are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  



About us

CheersandGears.com - Founded 2001

We  Cars

Get in touch

Follow us

Recent tweets

facebook

×