Jump to content
  • Greetings Guest!

    CheersandGears.com was founded in 2001 and is one of the oldest continuously operating automotive forums out there.  Come see why we have users who visit nearly every day for the past 16+ years. Signup is fast and free, or you can opt for a premium subscription to view the site ad-free.

Sign in to follow this  
William Maley

Jeep News: Production of Next-Generation Wrangler To Begin Next November

Recommended Posts

Details about the next Jeep Wrangler have been coming in drips and drabs. We know that it will be using aluminum panels to help cut weight, possibly feature a new turbocharged four-cylinder and eight-speed automatic, and feature a pickup variant. But there is one detail that can be confirmed, a production timeframe.

 

The Toledo Blade reports that Fiat Chrysler Automobiles will cease production of the Cherokee and begin retooling the line at Toledo assembly beginning in April. This to make way for the next-generation Wrangler production at the plant. Bruce Baumhower, president of United Auto Workers Local 12 tells the Blade production is expected to begin in November. FCA declined to comment when asked by the paper.

Baumhower went on to say production of the current Wrangler would continue uninterrupted during the retooling process. The current Wrangler would cease production in March 2018 to make way for the Wrangler pickup.

Production of the Cherokee will move over to FCA's Belvidere, Il plant. According to local media there, production of the Compass and Patriot ended on December 23rd. Retooling of this plant has already begun according to UAW officials. 

Source: The Toledo Blade

 


View full article

Share this post


Link to post
Share on other sites

Interesting to see the variants they make with the new wrangler. I wonder if there will be a hybrid or EV version in the future.

Share this post


Link to post
Share on other sites

Pretty excited for the new jeep......truck should be quite the site to see! Would be cool to see an EV jeep.....

Share this post


Link to post
Share on other sites

I can't wait, especially for the truck!  Still love the current Will's though and the amazing thing is that the curent gen, around since 07, still sales like hotcakes. 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

  • Who's Online   0 Members, 0 Anonymous, 27 Guests (See full list)

    There are no registered users currently online



  • Similar Content

    • By William Maley
      The Jeep Wagoneer and Grand Wagoneer has been talked about for the past few years, mostly in terms of delays and figuring out what platform will underpin it. But a new report from Road & Track reveals Jeep has something very special in store.
      An internal document from transmission supplier ZF lists the 2018 production and pre-production vehicles using a version of their 8HP eight-speed automatic transmission. Among the vehicles listed the Grand Wagoneer with the platform code ZS. What makes this more intriguing is the mention of a Grand Wagoneer Trackhawk. The listing says it has a 6.2L V8 and produces 729 PS - about 718 horsepower. Like the Grand Cherokee Trackhawk, the Wagoneer Trackhawk uses a beefed-up version of the eight-speed automatic - ZF-8HP95X.
      Could this mean that Jeep will be launching a mad Wagoneer in the coming years? Possibly not. Road & Track has some possible guesses as to why this is mentioned,
      Someone goofed while working on this document FCA has built some Wagoneer prototypes with the Hellcat engine, but hasn't made plans to put it into production Source: Road & Track

      View full article
    • By William Maley
      The Jeep Wagoneer and Grand Wagoneer has been talked about for the past few years, mostly in terms of delays and figuring out what platform will underpin it. But a new report from Road & Track reveals Jeep has something very special in store.
      An internal document from transmission supplier ZF lists the 2018 production and pre-production vehicles using a version of their 8HP eight-speed automatic transmission. Among the vehicles listed the Grand Wagoneer with the platform code ZS. What makes this more intriguing is the mention of a Grand Wagoneer Trackhawk. The listing says it has a 6.2L V8 and produces 729 PS - about 718 horsepower. Like the Grand Cherokee Trackhawk, the Wagoneer Trackhawk uses a beefed-up version of the eight-speed automatic - ZF-8HP95X.
      Could this mean that Jeep will be launching a mad Wagoneer in the coming years? Possibly not. Road & Track has some possible guesses as to why this is mentioned,
      Someone goofed while working on this document FCA has built some Wagoneer prototypes with the Hellcat engine, but hasn't made plans to put it into production Source: Road & Track
    • By William Maley
      Ford's original plan for the GT was to build the model for two years, with 250 units being built each year. Then Ford extended the production run to four years and expanded the total number of vehicles built to 1,000. So how is Ford doing on their production targets for the GT? According to Motor Authority, they haven't gone as planned.
      This information was first brought to light by a GT message board claiming Ford didn't reach their 250 unit goal for 2017. Motor Authority reached out to Ford and a spokesman confirmed that only 137 GTs were built last year. Why the delay?
      "This is a hand-built supercar, which we are committed to deliver flawlessly. We built into our process an extended ramp-up due to several factors such as global homologation testing and supplier constraints," the spokesman said in a statement.
      Multimatic, the company that is building the GT for Ford explained they "hadn't built cars on this scale before" and it them some time to meet its goal of building one car per work day. The company only reached this goal in the middle of last year. Issues with suppliers and minor issues also played a role. Multimatic did say that everything is on schedule for the full run of 250 vehicles for 2018.
      At the current pace, this would only mean Ford would produce 888 Its, 112 units short from their original goal. The Ford spokesman said they are sticking with their goal of 1,000 vehicles. This likely means Ford will extend production one more year to meet it.
      Source: Motor Authority

      View full article
    • By William Maley
      Ford's original plan for the GT was to build the model for two years, with 250 units being built each year. Then Ford extended the production run to four years and expanded the total number of vehicles built to 1,000. So how is Ford doing on their production targets for the GT? According to Motor Authority, they haven't gone as planned.
      This information was first brought to light by a GT message board claiming Ford didn't reach their 250 unit goal for 2017. Motor Authority reached out to Ford and a spokesman confirmed that only 137 GTs were built last year. Why the delay?
      "This is a hand-built supercar, which we are committed to deliver flawlessly. We built into our process an extended ramp-up due to several factors such as global homologation testing and supplier constraints," the spokesman said in a statement.
      Multimatic, the company that is building the GT for Ford explained they "hadn't built cars on this scale before" and it them some time to meet its goal of building one car per work day. The company only reached this goal in the middle of last year. Issues with suppliers and minor issues also played a role. Multimatic did say that everything is on schedule for the full run of 250 vehicles for 2018.
      At the current pace, this would only mean Ford would produce 888 Its, 112 units short from their original goal. The Ford spokesman said they are sticking with their goal of 1,000 vehicles. This likely means Ford will extend production one more year to meet it.
      Source: Motor Authority
    • By William Maley
      Volkswagen's Chattanooga, TN plant will soon have two more vehicles rolling off the line.
      Hinrich Woebcken, VW's North American CEO told Autocar that the upcoming I.D. Buzz and Crozz EVs for the region will be built at Chattanooga.
      “For strong product momentum, they need to be produced in the USA. It’s not possible to come into a high-volume scenario with imported cars. We want to localise electric mobility in the US,” said Woebcken.
      Woebcken also revealed that the models would be 'Americanized'.
      Source: Autocar

      View full article
  • My Clubs

  • Recently Browsing

    No registered users viewing this page.

  • Reader Rides

About us

CheersandGears.com - Founded 2001

We ♥ Cars

Get in touch

Follow us

Recent tweets

facebook

×

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.