Jump to content
Create New...
  • William Maley
    William Maley

    2013 SRT Viper Production Is Behind Schedule

    By William Maley

    Staff Writer - CheersandGears.com

    January 21, 2013

    If you're wondering why your Viper is taking longer than expected, we have an answer for you. SRT CEO Ralph Gilles tells the Detroit Free Press that Vipers will begin arriving mid-February, about a month and half later than originally promised.

    "I apologized to our dealer base. We are just holding ourselves to a higher standard," Gilles said.

    Gilles explained that Chrysler wants to make sure every Viper that rolls of the line is perfect before being shipped out to dealers.

    "To say it bluntly, the old Chrysler would have shipped them out already. It's really a hand-made car, so it takes a little finesse to get everything perfect."

    Source:Detroit Free Press

    William Maley is a staff writer for Cheers & Gears. He can be reached at [email protected] or you can follow him on twitter at @realmudmonster.


    User Feedback

    Recommended Comments

    no one is really going to care much about a Viper when the 14 corvette hits lots.

    Speak for yourself, the Viper is a winner no matter how you slice it, and honestly as an overall package from a design standpoint much more appealing than the Corvette IMO. I'm not taking anything away from the vette, but the new Viper stays true to what the Viper has always been while going way above what was expected in terms of refinement and hopefully quality.

    Link to comment
    Share on other sites

    Viper is Nice, but the New Vette is beautiful. Not perfect, but the best so far and for the price point, the Vette wins hands down.

    I read this as they have quality problems and had to go back and correct some major items to make sure your 100K car is near perfect as nothing ever is.

    Link to comment
    Share on other sites



    Join the conversation

    You can post now and register later. If you have an account, sign in now to post with your account.
    Note: Your post will require moderator approval before it will be visible.

    Guest
    Add a comment...

    ×   Pasted as rich text.   Paste as plain text instead

      Only 75 emoji are allowed.

    ×   Your link has been automatically embedded.   Display as a link instead

    ×   Your previous content has been restored.   Clear editor

    ×   You cannot paste images directly. Upload or insert images from URL.


  • google-news-icon.png



  • google-news-icon.png

  • Subscribe to Cheers & Gears

    Cheers and Gears Logo

    Since 2001 we've brought you real content and honest opinions, not AI-generated stuff with no feeling or opinions influenced by the manufacturers.

    Please consider subscribing. Subscriptions can be as little as $1.75 a month, and a paid subscription drops most ads.*
     

    You can view subscription options here.

    *a very limited number of ads contain special coupon deals for our members and will show

  • Community Hive Community Hive

    Community Hive allows you to follow your favorite communities all in one place.

    Follow on Community Hive
  • Similar Content

  • Posts

    • Interesting read, it does bring up a very important point, will the current CCS power walls work forward once everyone moves to NACS charge port? Does EV home-backup capability outmode the Tesla Powerwall? (greencarreports.com) Which Electric Cars Have Bidirectional Charging (V2L, V2G, V2H)? | Zecar | Resources | Lists
    • I have a feeling a co-pilot in a 747 is not landing for the first time here.
    • Very interesting as I am seeing more and more of these lists dominated by the Hyundai/Kia/Genesis product lines. Autotrader's Best New Cars of 2024 - Autotrader
    • My latest quest is a possible upgrade of my turntable. Right now I run a Fluance RT 82.   I just upgraded my CD game with an Audiolab 6000 CDT.    I am enjoying a ton of Vinyl right now. Classical, some jazz albums almost free. older albums often sound quite good and can be picked up quite cheaply.       
    • I am not aware of travel cases for internal drives. Usually you have the drive and once you have made sure you own static electricity is discharged on your body, open the computer and unplug the power cable and data cable to the HD. Then you unscrew the screws holding the drive in. Put the drive into an Anti-Static bag and then usually into a box that has foam padding on all sides to protect the drive and then tape it up to close it.  With both drives in their proper storage bags, you can then have both drives in between foam insulation for handling any dropping of the box, etc. Pack them in a box and tape shut, should then easily handle going through your carry on or checked in luggage. To ship a hard drive, you need to: Secure the hard drive in its original packaging or anti-static bag. If you don't have an anti-static bag, place the drive into a zipped freezer bag to prevent any moisture getting into the drive during transit. Sandwich the drive between foam or wrap it in bubble wrap to absorb any minor shocks. Put the hard drive in a padded shipping box. Close and seal the box. Label your package. Amazon.com : hard drive shipping box This is pretty much all you need.
  • Who's Online (See full list)

    • There are no registered users currently online
  • My Clubs

×
×
  • Create New...

Hey there, we noticed you're using an ad-blocker. We're a small site that is supported by ads or subscriptions. We rely on these to pay for server costs and vehicle reviews.  Please consider whitelisting us in your ad-blocker, or if you really like what you see, you can pick up one of our subscriptions for just $1.75 a month or $15 a year. It may not seem like a lot, but it goes a long way to help support real, honest content, that isn't generated by an AI bot.

See you out there.

Drew
Editor-in-Chief

Write what you are looking for and press enter or click the search icon to begin your search

Change privacy settings