Chrysler News: 2013 SRT Viper Production Is Behind Schedule
Featured Replies
Latest News
-
The third-generation Volkswagen Atlas made its debut at the New York International Auto Show, built on an all-new MQB evo platform that adds about an inch of length to the three-row SUV and brings the most substantial interior redesign the Atlas has seen since its 2017 launch. Exterior Design The new Atlas adopts a sharper, more geometric front end. Double-stacked LED headlights run the full width of the nose, and an illuminated VW badge is standard on all trims except the base. Three
- volkswagen
- atlas
- mqb evo
- three-row suv
-
Tagged with:
At the New York International Auto Show, Volkswagen unveiled the third-generation Atlas, built on an all-new MQB evo platform with a redesigned bold loop interior, a 282-horsepower engine, and a 15-inch touchscreen on most trims. It goes on sale in fall 2026.
Updated by Drew Dowdell- 9 comments
- 1,543 views
-
Chrysler invented the minivan 43 years ago, and more than 16.6 million of them later, the Pacifica arrives at the 2026 New York International Auto Show with its most significant visual update in years. The 2027 Pacifica debuts a new front fascia that Chrysler says defines the design language for the brand going forward. A New Face for the Brand The exterior redesign applies to the Select, Limited, and Pinnacle trims. The new entry-level LX (the renamed Voyager) retains its familiar ext
Chrysler's best-selling minivan gets a new face for 2027, with an illuminated wing badge and "piano key" LED grille accents previewing the design direction for the brand's next generation of vehicles.
Updated by Drew Dowdell- 19 comments
- 1,638 views
-
Subaru unveiled the all-new 2027 Getaway at the 2026 New York International Auto Show, a three-row battery-electric SUV that brings 420 horsepower and Symmetrical All-Wheel Drive to every trim level. The Getaway is the most powerful production Subaru ever built and the brand's fourth BEV, with seating for up to seven, 8.3 inches of ground clearance, and a 95.8-kWh battery rated for more than 300 miles of range. Buyers shopping the three-row electric family SUV segment may notice some familiar
- subaru
- getaway
- electric suv
- three-row suv
-
Tagged with:
Subaru unveiled the all-new 2027 Getaway at the 2026 New York International Auto Show, a three-row BEV with 420 horsepower, standard Symmetrical All-Wheel Drive, more than 300 miles of range, and seating for up to seven.
Updated by Drew Dowdell- 7 comments
- 1,396 views
-
Subaru of America has announced the first-ever Forester Wilderness Hybrid for 2027, bringing the efficiency of Subaru's hybrid system to its most capable Forester variant. The Forester Wilderness Hybrid uses the same Atkinson/Miller-cycle 2.5-liter SUBARU BOXER engine and series-parallel hybrid configuration as the standard Forester Hybrid, but output climbs to 194 horsepower total system power, up from 180 horsepower in the non-hybrid Forester Wilderness. Subaru claims up to 25% better fuel eco
- subaru
- forester
- forester wilderness
- hybrid
-
Tagged with:
Subaru has announced the first hybrid variant of the Forester Wilderness for 2027, offering 194 horsepower, 9.3 inches of ground clearance, and Symmetrical All-Wheel Drive alongside a claimed 25% improvement in fuel economy over the standard model.
Updated by Drew Dowdell- 1 comment
- 1,238 views
Who's Online (See full list)
- There are no registered users currently online
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.