Jump to content
William Maley

Nissan News: Nissan Boosts Production Of Rogue, Adding Two New Models

Recommended Posts

The Nissan Rogue crossover is proving to be a very popular vehicle for the brand. Through the first half of the year, Nissan has moved 135,397 Rogues - making this the second best-selling model behind the Altima. According to Automotive News, Nissan will be tapping its Kyushu, Japan factory to produce an extra 100,000 Rogues starting next year. This will help give Nissan the ability to sell 300,000 Rogues.

 

Automotive News also reports that the company will be introducing two new variants of the Rogue in the future. According to two sources, Nissan will launch a hybrid Rogue next year. Following this will be the smaller Qashqai crossover. Based on the Rogue's platform, the Qashqai is about 10 inches shorter and two inches narrower. This is expected to be the replacement for the Rogue Select, which is the last-generation Rogue.

 

Source: Automotive News (Subscription Required)


View full article

Share this post


Link to post
Share on other sites

The current Rogue does look sort of big, looks more midsize than small anyway.  So I can see need for a smaller one because of the CX-3, HRV, Trax, etc.

Share this post


Link to post
Share on other sites

I could see a Sport and a Nisimo Models being added.

Share this post


Link to post
Share on other sites

The current Rogue does look sort of big, looks more midsize than small anyway.  So I can see need for a smaller one because of the CX-3, HRV, Trax, etc.

 

My neighbor just bought a loaded one and I mistook it for a Pathfinder at first

Share this post


Link to post
Share on other sites

The old Rogue was pretty small, I was behind a new one the other day and it seemed like a midsize, it just looked big. 

Share this post


Link to post
Share on other sites

They need something that is more sane than the Juke in the tiny CUV class.  Cashcow is an odd name for it though.

 

Reg  :AH-HA:

Edited by ocnblu
  • Upvote 1

Share this post


Link to post
Share on other sites

anything that takes sales from the crap crv is fine with me.  and yes, i would never juke but this littler rogue i might check it out

Share this post


Link to post
Share on other sites

From behind the new Rogue looks a lot like the Escape to me..I keep confusing them.   One of my coworkers bought a new Murano a couple weeks ago, ridden in it a couple of times..seems spacious inside.

Share this post


Link to post
Share on other sites

I like the Rogue. I blends kind of with the CR-v and Rav4 for being just a comfy runabout, but it's styling is solid and its a decent product. I like it a lot.

Share this post


Link to post
Share on other sites

It is fairly decent looking for its class, but the QR25DE engine is not exactly great (maybe the hybrid will actually be an upgrade in more than just fuel economy).

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

    • By dfelt
      UK Sales started on Nissan Energy Solar System 

      Nissan has announced the start of their all encompassing Solar Energy System. This system has the ability to reduce home electric bills by 66%, increased independence from the national grid and electricity providers and the ability to generate, store and manage energy use overnight. Nissan says even on overcast or rainy days the system will still do all this and provide charging to your Nissan EVs.
      Nissan says the basic home system starts at £3,881 and includes the supply and installation of six solar panel system, home energy management system and VAT at 5%. For those that do not speak UK Pound Sterling, this is equal to $5,242.45 at todays 5/17/2018 conversion rate for Dollars. 
       
      To get a complete solar panel system plus the XStorage unit that would be installed in your garage, your price starts at £7,635 or $10,313.46 at todays 5/17/2018 conversion rate for Dollars. Nissan is also selling additional storage units for £6,446 or $8,707.34 allowing one to go totally grid free if they so choose to add more panels and storage systems to fully support the house.

        The Nissan Solar System allows one to use the Nissan wireless charging mat under their Nissan EV and if you need a bit of extra energy, you can always pull it from your auto battery and then return it later on. This maximizes the efficiency of electrical grid and solar solution.
      Nissan UK Solar System web site
      Nissan has stayed silent on if or when they plan to bring this to the US. Right now they are focused on the UK, a much smaller market. Yet once they feel this is perfected, it will be a solid competitor to the Tesla SolarCity panels and Powerwall 2 which has seen a large drop in installations since Tesla bought them out. With a 57% drop in installations and what shareholders see as a clear conflict of interest due to the bonds that the Tesla CEO and his family members held, it would see they had more to gain than the shareholders. A Delaware judge is letting the lawsuit move forward creating more headache for CEO Musk.
      Solarcity & Powerwall 2 web site
      Clearly Nissan has taken ideas on their ideas of a smart street with fluid green energy being used between the auto and the home. For more pictures and info on this check out the story posted March 16 2016 here:
      Nissan Press Release
      Tesla Solarcity & Powerwall lawsuit
    • By William Maley
      Last week, Ford halted production of their F-Series pickup after a fire ravaged a supplier's plant in Southwestern Michigan. While Ford and supplier Meridan said everything was ok, analysts said it the shutdown could hurt Ford if it lasted more than a week. Last night, Ford announced that it would restart production of the F-150 at their Dearborn plant on Friday. Production at Kansas City and Louisville will come back online on Monday.
      Getting to this point took a lot of work for both Ford and Meridan. According to Automotive News, Ford was the first automaker on site after the fire and was able to retrieve all of the tooling over a 48-hour period. One of dies used was shipped to Meridan's plant in Nottingham, UK. To get it there was a bit of a challenge since it weighs 87,000 pounds. Ford was able to charter an Antonov cargo plane (one of just 21 planes in the world that handle this task) and get it shipped to the UK in just 30 hours.
      Faced with unexpected adversity, the Ford team, including our global supply partners, showed unbelievable resiliency, turning a devastating event into a shining example of teamwork. Thanks to their heroic efforts, we are resuming production of some of our most important vehicles ahead of our original targets," said Hau Thai-Tang, Ford's executive vice president of product development and purchasing in a statement.
      Ford declined to say how much production was lost during the shutdown. James Albertine, an analyst with Consumer Edge Research said the week before that Ford could lose up to 15,000 trucks due per week due to the shutdown.
      The company is planning to make up for some of the lost production by shortening the summer shutdown at the Dearborn and Kansas City plants.
      Source: Automotive News (Subscription Required), Ford


      Ford Restarting F-150, Super Duty Production Ahead Of Schedule After Fire At Magnesium Parts Supplier
      Ford is resuming production of the F-150 pickup at Dearborn Truck Plant on Friday. Ford team has also successfully repaired the supply chain for Super Duty; production targeted to restart by Monday for Super Duty at Kentucky Truck Plant and F-150 at Kansas City Assembly Plant Ford marshaled a global team of experts, that included partners and suppliers, following a May 2 fire at Meridian Magnesium Products in Eaton Rapids, Mich., to quickly refurbish and relocate tooling needed to produce parts for the Ford F-150, Super Duty and five other vehicles – Ford Expedition, Explorer, Flex and Lincoln Navigator and MKT Because of this quick action, Meridian is producing truck parts again at its Eaton Rapids facility. Plus, Ford airlifted tooling to a Meridian facility in the U.K. to produce parts for F-150, which will further speed production ramp-up Ford Expedition, Explorer, Flex and Lincoln Navigator and MKT production continue uninterrupted Company reaffirms 2018 adjusted EPS guidance range of $1.45 to $1.70; expects adverse impact of $0.12 to $0.14 per share in second quarter due to lost production DEARBORN, Mich., May 16, 2018 – Ford Motor Company is restarting production of the popular F-150 at Dearborn Truck Plant Friday after just over one week of downtime. The company has also successfully repaired the supply chain for Super Duty, with production targeted to restart by Monday at the Kentucky Truck Plant as well as the Kansas City Assembly Plant that also makes F-150 pickups.
      This follows the massive May 2 fire at the Meridian Magnesium Products facility in Eaton Rapids, Mich.
      “While the situation remains extremely dynamic, our teams are focused on returning our plants to full production as fast as possible,” said Joe Hinrichs, Ford president, Global Operations. “The ramp-up time to full production is improving every day.”
      Ford teams, together with suppliers including Walbridge and other contractors, worked nearly around the clock to get America’s best-selling vehicle franchise back on line as quickly as possible.
      The teams removed 19 dies from Meridian’s badly damaged facility, and in one case, moved an 87,000-pound die from Eaton Rapids, Mich., to Nottingham, U.K., via an Antonov cargo plane – one of the largest in the world – in just 30 hours door-to-door. A die is a tool used to cut or shape material using a press.
      “Faced with unexpected adversity, the Ford team, including our global supply partners, showed unbelievable resiliency, turning a devastating event into a shining example of teamwork,” said Hau Thai-Tang, Ford’s executive vice president of Product Development and Purchasing. “Thanks to their heroic efforts, we are resuming production of some of our most important vehicles ahead of our original targets.”
      Work started immediately in the aftermath of the May 2 fire. Teams removed and remediated safety concerns – including dangling siding – and restored electricity, gaining approval to access the site while debris still smoldered inside.
      This allowed Ford and Meridian to safely retrieve and relocate tools to more quickly resume part production and work to minimize the financial impact of the stalled plants.
      Ford recovered, repaired and validated most dies that were at the Eaton Rapids facility, and Meridian is now producing parts for the F-150 at two locations – Eaton Rapids and Nottingham, U.K. Production of bolsters for Super Duty is also restarting at the Eaton Rapids plant.
      Under normal circumstances, moving tooling the size of a bolster die would take approximately 10 days just to get the proper import and export approvals. However, Ford and its suppliers managed to cut the total time for the entire move to 30 hours, including trans-Atlantic flight time.
      When the team removed the die from the Eaton Rapids factory, it was shipped to Rickenbacker International Airport in Columbus, Ohio. Rickenbacker had both the capacity to handle such a large piece of equipment and allowed an Antonov An-124 Russian plane, one of the largest planes in the world – typically used to transport trains, dump trucks and even a 25-foot sea yacht – to take off as soon as the equipment was loaded.
      Nearly 4,000 miles away, a team in Nottingham was waiting to receive the die and take it to Meridian’s nearby factory. In between, the Ford team received a U.K. import license for the die – a mere two hours before the plane touched down.
      Parts produced at Nottingham are being shipped via daily flights on a Boeing 747 jet until production in Eaton Rapids returns to pre-fire levels.
      Inventories of Ford’s best-selling F-Series pickups and other vehicles remain strong and customers won’t have a problem finding the model they want.

      View full article
    • By William Maley
      Last week, Ford halted production of their F-Series pickup after a fire ravaged a supplier's plant in Southwestern Michigan. While Ford and supplier Meridan said everything was ok, analysts said it the shutdown could hurt Ford if it lasted more than a week. Last night, Ford announced that it would restart production of the F-150 at their Dearborn plant on Friday. Production at Kansas City and Louisville will come back online on Monday.
      Getting to this point took a lot of work for both Ford and Meridan. According to Automotive News, Ford was the first automaker on site after the fire and was able to retrieve all of the tooling over a 48-hour period. One of dies used was shipped to Meridan's plant in Nottingham, UK. To get it there was a bit of a challenge since it weighs 87,000 pounds. Ford was able to charter an Antonov cargo plane (one of just 21 planes in the world that handle this task) and get it shipped to the UK in just 30 hours.
      Faced with unexpected adversity, the Ford team, including our global supply partners, showed unbelievable resiliency, turning a devastating event into a shining example of teamwork. Thanks to their heroic efforts, we are resuming production of some of our most important vehicles ahead of our original targets," said Hau Thai-Tang, Ford's executive vice president of product development and purchasing in a statement.
      Ford declined to say how much production was lost during the shutdown. James Albertine, an analyst with Consumer Edge Research said the week before that Ford could lose up to 15,000 trucks due per week due to the shutdown.
      The company is planning to make up for some of the lost production by shortening the summer shutdown at the Dearborn and Kansas City plants.
      Source: Automotive News (Subscription Required), Ford


      Ford Restarting F-150, Super Duty Production Ahead Of Schedule After Fire At Magnesium Parts Supplier
      Ford is resuming production of the F-150 pickup at Dearborn Truck Plant on Friday. Ford team has also successfully repaired the supply chain for Super Duty; production targeted to restart by Monday for Super Duty at Kentucky Truck Plant and F-150 at Kansas City Assembly Plant Ford marshaled a global team of experts, that included partners and suppliers, following a May 2 fire at Meridian Magnesium Products in Eaton Rapids, Mich., to quickly refurbish and relocate tooling needed to produce parts for the Ford F-150, Super Duty and five other vehicles – Ford Expedition, Explorer, Flex and Lincoln Navigator and MKT Because of this quick action, Meridian is producing truck parts again at its Eaton Rapids facility. Plus, Ford airlifted tooling to a Meridian facility in the U.K. to produce parts for F-150, which will further speed production ramp-up Ford Expedition, Explorer, Flex and Lincoln Navigator and MKT production continue uninterrupted Company reaffirms 2018 adjusted EPS guidance range of $1.45 to $1.70; expects adverse impact of $0.12 to $0.14 per share in second quarter due to lost production DEARBORN, Mich., May 16, 2018 – Ford Motor Company is restarting production of the popular F-150 at Dearborn Truck Plant Friday after just over one week of downtime. The company has also successfully repaired the supply chain for Super Duty, with production targeted to restart by Monday at the Kentucky Truck Plant as well as the Kansas City Assembly Plant that also makes F-150 pickups.
      This follows the massive May 2 fire at the Meridian Magnesium Products facility in Eaton Rapids, Mich.
      “While the situation remains extremely dynamic, our teams are focused on returning our plants to full production as fast as possible,” said Joe Hinrichs, Ford president, Global Operations. “The ramp-up time to full production is improving every day.”
      Ford teams, together with suppliers including Walbridge and other contractors, worked nearly around the clock to get America’s best-selling vehicle franchise back on line as quickly as possible.
      The teams removed 19 dies from Meridian’s badly damaged facility, and in one case, moved an 87,000-pound die from Eaton Rapids, Mich., to Nottingham, U.K., via an Antonov cargo plane – one of the largest in the world – in just 30 hours door-to-door. A die is a tool used to cut or shape material using a press.
      “Faced with unexpected adversity, the Ford team, including our global supply partners, showed unbelievable resiliency, turning a devastating event into a shining example of teamwork,” said Hau Thai-Tang, Ford’s executive vice president of Product Development and Purchasing. “Thanks to their heroic efforts, we are resuming production of some of our most important vehicles ahead of our original targets.”
      Work started immediately in the aftermath of the May 2 fire. Teams removed and remediated safety concerns – including dangling siding – and restored electricity, gaining approval to access the site while debris still smoldered inside.
      This allowed Ford and Meridian to safely retrieve and relocate tools to more quickly resume part production and work to minimize the financial impact of the stalled plants.
      Ford recovered, repaired and validated most dies that were at the Eaton Rapids facility, and Meridian is now producing parts for the F-150 at two locations – Eaton Rapids and Nottingham, U.K. Production of bolsters for Super Duty is also restarting at the Eaton Rapids plant.
      Under normal circumstances, moving tooling the size of a bolster die would take approximately 10 days just to get the proper import and export approvals. However, Ford and its suppliers managed to cut the total time for the entire move to 30 hours, including trans-Atlantic flight time.
      When the team removed the die from the Eaton Rapids factory, it was shipped to Rickenbacker International Airport in Columbus, Ohio. Rickenbacker had both the capacity to handle such a large piece of equipment and allowed an Antonov An-124 Russian plane, one of the largest planes in the world – typically used to transport trains, dump trucks and even a 25-foot sea yacht – to take off as soon as the equipment was loaded.
      Nearly 4,000 miles away, a team in Nottingham was waiting to receive the die and take it to Meridian’s nearby factory. In between, the Ford team received a U.K. import license for the die – a mere two hours before the plane touched down.
      Parts produced at Nottingham are being shipped via daily flights on a Boeing 747 jet until production in Eaton Rapids returns to pre-fire levels.
      Inventories of Ford’s best-selling F-Series pickups and other vehicles remain strong and customers won’t have a problem finding the model they want.
    • By dfelt
      EV Battery War Heats UP, Asia Versus America!
      Seems America, Tesla and the department of energy have created the next war. This is the Battery war, Lithium Ion versus Solid State batteries and Japan is behind. As such according to the story in the Nikkei, the Japanese government is funding research by leading Japanese manufacturers to develop what they believe will power the EVs of the future.
      This group brings together the Japanese Consortium for Lithium Ion Battery Technology and Evaluation Center (Libtec) with Toyota Motor, Nissan Motor, Honda Motor, Panasonic and battery maker GS Yuasa to develop rapid charging solid-state batteries that are easier to manufacture, safer, denser energy and costs less.
      The story goes on to say that Toyota's Solid State battery technology is considered to be the most advanced in the world, but is not commercialized yet. This new consortium is meant to make this happen by being funded by the Japanese government. This should help Japan beat China, Korea and the US in having the fastest charging, safest and densest battery packs in the world. Current market numbers are that global battery market shows Japan had 70% in 2013 but shrunk to 41% today, China and Korea combine for 26% today from 3% in 2013
      The consortium is quoted as bringing the smaller but denser 400km Toyota solid state battery pack to market in the next 18 months in current EVs and have the size grow of the solid state batteries grow very little while having 550km batteries by 2025 and 800km batteries by 2030. For those that are a bit rusty on their metric, this equates to 249, 342, and 497 miles of range in a small dense battery pack.
      Japan industry ministry is eager for the country to reclaim its global dominance by setting the standard for solid-state batteries.

      Nikkei Story
    • By William Maley
      A fire at a supplier's plant last week is causing some headaches for Ford. The company has halted production of the F-150 at Kansas City Assembly Plant, and F-Series Super Duty at Kentucky Truck and Ohio Assembly due to a parts shortage. F-150 production at Ford's Dearborn plant is expected to be idled either today or tomorrow.
      The supplier, Meridian Lightweight Technologies makes instrument panel components for the F-Series trucks. Last Wednesday, the company's factory in Eaton Rapids, Michigan caught fire. The cause is still being investigated, but the Lansing State Journal reports the fire started in an area known as the "tunnel," a place where workers put magnesium scraps on a conveyor belt to be melted down. The fire caused a number of explosions to take place in the factory. Two people were injured and 150 workers were evacuated.
      The situation at the moment is ok according to Ford and analysts if the shutdown only lasts a week. There is an 84-day supply of trucks and Ford is working with Meridan to figure out the “next steps.” But as AutoPacific analyst Dave Sullivan points out, this could cause some serious problems for Ford if it lasts more than a week.
      "They should be able to weather a short-term shutdown. But if this goes longer than a week, it could really hurt second-quarter performance," Sullivan tells the Free Press.
      Ford isn't the only automaker that is being affected by this.
      General Motors has halted production of the Chevrolet Express and GMC Savana at their Wentizville assembly plant in Missouri. FCA told Automotive News that the fire has affected the output of the Chrysler Pacifica, built at their Windsor, Ontario plant. They are "adjusting production schedules as needed to minimize plant downtime (and) will make up any lost production." Mercedes-Benz in a statement said, "we have cancelled production shifts in certain areas and adjusted production hours for our team members this week," at their Vance, Alabama plant - home to C-Class, GLE-Class, GLE-Coupe, and GLS-Class production. BMW told Automotive News that production of the X5 at their South Carolina plant will be affected somewhat, but their current supply of parts should keep them running for the time being. Source: Automotive News (Subscription Required), Detroit Free Press, Lansing State Journal

      View full article
  • My Clubs

  • Recently Browsing

    No registered users viewing this page.

  • Reader Rides

About us

CheersandGears.com - Founded 2001

We ♥ Cars

Get in touch

Follow us

Recent tweets

facebook

×

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.